The commissioning page also generates a complete system handover manual for quick documentation purposes. Just add serial numbers (copy and paste, or upload a .csv or .pdf), complete the commissioning checklist, upload any additional docs such as Compliance Certificate, and sign off. Then download or email the complete system handover manual at the bottom of the page.

Access and Navigation

  • Open a quote / install

  • Click the blue arrow on the right of the workflow

The Commission page can also be used on-site with a tablet or phone.

Component Serial Numbers

There are 3 options for including serial numbers in the Handover manual:

  1. Copy and paste the serial numbers into the fields provided

  2. Upload a .csv file with the serial numbers (ensure they are all in 1 column, with 1 serial number per row, in the same order they appear in the list on the commissioning page). Once the CSV file is selected on the commissioning page to upload, scroll to the bottom of the page and hit 'Save' to populate the data.

  3. Upload a .pdf / image file with the serial numbers (eg from your STC trader), at the bottom of the page under Commissioned Site Images and PDF Files. In this case, toggle ‘Show Serials in Manual’ to NO.

 

Pre Commissioning Checklist

  • The pre-commissioning checklist allow the user to verify the safety checks, to prevent electrical faults and hazards.

  • The pre-commissioning checklist displays toggle buttons, that helps the user to confirm the pre-validation protocols for installation of system.

  • The first two checks are part of an essential safety precaution before beginning the commissioning process and enable the full commissioning form to display.

 

Commissioning

The Commissioning page displays critical information regarding the system, like the system name and the nominal power output from the system. These are listed as small labels in the commissioning tab.

In addition, the commissioning window also houses toggle buttons to verify numerous checks relating to different components in the system design.

Sub-array & String Tests

For each MPPT array and each string of each array, there are checks for:

  • Continuity: Y/N

  • Polarity: Y/N

  • Voc: Value

  • Isc: Value

Earth Resistance

  • Array Positive to Earth: value

  • Array Negative to Earth: value

System Operation

  • PV Array Operating Voltage: value

  • PV array operating current: value

  • Switch disconnector under load: Y/N

Quality Control Checks

  • Mounting Systems: Y/N

  • Connectors (same type): Y/N

  • Cable protection (mechanical):

  • Earth (equipotential): Y/N

  • Functional Earth: Y/N

  • UV protection: Y/N

  • Signage correct: Y/N

  • Earth resistance

System Checklist

The System Checklist is always included in the handover manual, and covers all mandatory checks for AS/NZS 4777, 5033, 5139 and 4509

Commissioning Notes

This section of the commission page provides space for the user to include critical information, that must be carried forward to the system designer/installer /electrical contractor during the commissioning phase of a system designed in SolarPlus. This can included, but is not limited to:

  • The network settings programmed into the inverter

  • The battery charge set points

  • Login information for monitoring portals

 

Installer/Designer Declaration of Compliance

The Declaration of Mounting Compliance verifies the validation of mounting systems with the approved/licensed electrician/solar installer. This section provides information, relating to the approval agency, electrician details, Accreditation and electrical licence numbers for installers to allow users to follow-up for future quotes and installations.

Commissioned Site Images and PDF Files

The last section of the commissioning page provides space for the user to upload images and PDF files for documentation purposes, with the option to also be included as part of the system manual. This can included, but is not limited to:

  • Installation photos

  • Certificate of Electrical Safety

  • Site-specific warranty certificates

  • Site-specific engineering certificates

 

Download / send Handover Manual

At the bottom of the page, simply click the button to download the manual or email to the customer.

The ‘Include component PDF manuals’ checkbox allows you to select whether to include the manuals/brochures of the inverter, modules and other system components to be a part of the system manual PDF.

 