Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

The SLD is automatically generated based on the equipment and configurations specified on the design page.

Adding notes

You can add extra information to the SLD by adding notes. With your mouse above the SLD, right click, and the note box will appear.

Grid protection device / Secondary Protection

To include a grid protection device on the SLD, first make sure that a grid protection device exists in your inventory. If not, you can create a custom item in your inventory and assign the item category as “Grid protection device”. When you select a grid protection device in a quote, it will automatically be added to the SLD.

To add the grid protection settings for a specific device, go to Inventory > search for the unit, and click the edit icon.

In the Description field, type in the grid settings.

Those settings listed in the Description will now appear in the SLD.

Automatic Transfer Switch, aka Backup box

The ATS symbol will be added to the SLD if Grid Configuration is set to Back-up (ext). The model name of the ATS will also appear in the text boxes below the SLD when an item with category ‘Automatic Transfer Switch / Back-up’ is selected in the quote.

Export limit device / Energy meter

Add any Energy Meter to the design page and the CT and data connection will be shown to satisfy this requirement. If you don't have any appearing in the select list, you can add them from the Product Library ‘General Components’ tab, or just create your own inventory item with the category set as 'Energy meter'.

Sub-board / distribution board

To add a sub-board, specify the length of the sub-main cable in the AC cable section of the Solar and Battery design page.

AC-coupled off-grid

Not all system configurations have SLDs automatically produced. We are still working on AC-coupled and AC/DC coupled off-grid.

  • No labels